Donate using PayPal

All photos in & around Ashford (Surrey)

Showing items 1 to 100 from total of 156 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
165466Photo #165466Improve riverside path for cyclists & walkers/joggersCycleway:
Problem
cycleways
165465Photo #165465Improve riverside path for cyclists & walkers/joggersCycleway:
Problem
cycleways
165464Photo #165464Improve riverside path for cyclists & walkers/joggersCycleway:
Problem
cycleways
165463Photo #165463Improve riverside path for cyclists & walkers/joggersCycleway:
Problem
cycleways
164479Photo #164479Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164477Photo #164477Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164474Photo #164474Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164473Photo #164473Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164472Photo #164472Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164471Photo #164471Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164470Photo #164470Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164469Photo #164469Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164468Photo #164468Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164467Photo #164467Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164466Photo #164466Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164465Photo #164465Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164464Photo #164464Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164463Photo #164463Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164462Photo #164462Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164461Photo #164461Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansTrack:
Problem
track
164460Photo #164460Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164459Photo #164459Improve & widen towpath for dual use - needs resurfacing in places- for bikes and pedestriansCycleway:
Problem
cycleways
164275Photo #164275Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164274Photo #164274Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164273Photo #164273Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164272Photo #164272Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164271Photo #164271Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164270Photo #164270Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164269Photo #164269Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164268Photo #164268Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164267Photo #164267Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164266Photo #164266Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164265Photo #164265Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164264Photo #164264Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164263Photo #164263Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164261Photo #164261Slow down traffic past school – 20 mph – www.20splentyorgTemporary closure:
Problem
closure
164260Photo #164260Needs footbridge across lockTrack:
Problem
track
155684Photo #155684School Walk could be converted into shared use as a traffic-free route for cycling. If parts are safe for motor vehicle access, it must be safe for cycling.Cycleway:
Problem
cycleways
144531Photo #144531Cars park immediately next to the end of the cycle lane, blocking the existing lane. Extending the lane would clearly indicate how much room is needed to get a bike past.Cycleway:
Problem
cycleways
143999Photo #143999Narrow road that is used by people cycling has become used a vehicular short cut to new Walton Bridge. Keep through motor traffic on A308.Temporary closure:
Problem
closure
141439Photo #141439Footpath outside the pub entrance and corner is too narrow to use safely even for one person alone, impossible for pushchair or wheelchairTrack:
Problem
track
140942Photo #140942Public footpath no. 25 or 26 to Shortwood common. Vegetation needs cutting back that has overgrown the path in placesCycleway:
Problem
cycleways
136655Photo #136655Now that a crash barrier has been built in the middle of the road, cars are speeding even more than usual. A dedicated cycle lane is needed as the pavement is full of tree roots and far too narrow.Cycleway:
Problem
cycleways
130276Photo #130276A cycleway would be a huge benefi. The road is used by lots of large lorries and is very narrow in places leaving cyclists quite exposed.Cycleway:
Problem
cycleways
130272Photo #130272A very narrow windey road in places that a business park is situated down and accordingly a lot of large lorries use this roadCycleway:
Problem
cycleways
129178Photo #129178Very hard to cross road - no signals for pedestrians on some arms and fast cars/ lots of traffic lanes. Make this junction accessible for pedestrians.Track:
Problem
track
129091Photo #129091Nasty pinch point. Cyclists expected to use narrow pavement and give way to side road, or take the lane and risk drivers trying to squeeze past or angrily revving their engines behind you.Cycleway:
Problem
cycleways
127998Photo #127998The road is very wide and there is plenty of space for a segregated lane. If done in conjunction with other suggestions on Fordbridge Road this would create a continuous route between Ashford and Staines.Cycleway:
Problem
cycleways
126423Photo #126423Narrow lane exists but in very poor condition and paint worn away.Cycleway:
Problem
cycleways
123598Photo #123598Make cycleway fully protected all the way to Walton Bridge.Cycleway:
Problem
cycleways
123597Photo #123597Create an official cycle cut through here to avoid having to go up to the roundabout and back.Cycleway:
Problem
cycleways
123595Photo #123595Pavements are narrow here and always parked on. Road speed is fast, pavement needs to be restored to be for people not drivers.Track:
Problem
track
123593Photo #123593Wide lanes. Could easily add a protected cycleway and slow the speed limit to 30.Cycleway:
Problem
cycleways
123592Photo #123592Barriers need to be removed on the pavement outside school as not enough space to socially distance.Track:
Problem
track
123591Photo #123591Pavement parking is a real issue here. Pavement is not wide enough to socially distance.Track:
Problem
track
123590Photo #123590These roads are a rat run and need to be filtered to allow space for distancing.Temporary closure:
Problem
closure
123589Photo #123589Remove one lane of traffic in each direction and create a full width on road cycleway. Can be done with cones and wands to start with.Cycleway:
Problem
cycleways
123588Photo #123588Cycle access on the roundabout is poor. Need to lengthen a couple of light phases so cyclists can get through them in time and change lane markings to ensure drivers do not cut into cyclists.Cycleway:
Problem
cycleways
123577Photo #123577Fast road with wide lanes. Wand protected cycleway could easily be added in both directions along this road.Cycleway:
Problem
cycleways
122760Photo #122760This is a long road with room to install a cycle lane from the sides of the road.Cycleway:
Problem
cycleways
122757Photo #122757Pavement on rail bridge ramps too narrow (OK atop bridge). Cycle lanes designated and technically OK, but often enough cars overtaking in no visibility of oncoming traffic.Track:
Problem
track
122753Photo #122753Traffic squeezing through, multiple lanesCycleway:
Problem
cycleways
121908Photo #121908Pavement isn’t wide enough! For walkers or cyclistsTrack:
Problem
track
120594Photo #120594This part of Walton Lane should be closed to all motorised traffic. To reduce the rat run through Portmore ParkTemporary closure:
Problem
closure
119987Photo #119987Used regularly by school children between two Riverbridge bases and Our Lady of the Rosary as well as commuters using the station so becomes very busy.Track:
Problem
track
119182Photo #119182Very small pavement, busy area, lots of cyclists so can’t walk into the road to maintain social distanceTrack:
Problem
track
118028Photo #118028Painted cycle lanes need protection. Vegetation on the verge needs to be cut back as is encroaching into the cycle lane.Cycleway:
Problem
cycleways
118025Photo #118025Very narrow street and pavements would mean that should traffic return, social distancing would be impossibleTemporary closure:
Problem
closure
118021Photo #118021Needs wider protected cyclewayCycleway:
Problem
cycleways
117856Photo #117856Pavement parking an issueTrack:
Problem
track
117854Photo #117854Fast moving traffic on a wide road. Needs protected cycle lane in both directions.Cycleway:
Problem
cycleways
116753Photo #116753A cyclist has already been killed on here this year so a protected cycleway needs to be added and speed limit enforced.Cycleway:
Problem
cycleways
116726Photo #116726The barriers at these lights need removing to make space for people walking. Control driver speeds at the junction rather than allowing them to speed but keeping walkers penned in.Track:
Problem
track
116723Photo #116723Protected cycle lane and Cycle priority lights should be added here to join the lane over the junction. The pavement and crossing are too narrow to socially distance from cyclists too.Cycleway:
Problem
cycleways
116717Photo #116717This road should be made access only, there is a school on it and it is treated as a rat run. People will need to queue into the road when schools restart.Temporary closure:
Problem
closure
116710Photo #116710Protected cycleway should be created down this road as its heavily used but drivers go too fast. Additionally pavement parking should be restricted to ensure space for social distancing while walking.Cycleway:
Problem
cycleways
116706Photo #116706Cycleway should be extended from School Road (protected not just paint) one lane in each direction can be closed to accommodate, which also will lower speeds to nearer the speed limit and reduce noise for residents.Cycleway:
Problem
cycleways
116703Photo #116703Current paint cycleway should be made protected and parking on the pavement should be heavily restricted (can be done by using wands to create the cycleway). Additionally the speed limit should be lowered as this street has a school on it.Cycleway:
Problem
cycleways
116699Photo #116699Road should be made access only as it is used as a rat run and pedestrians and cyclists are heavy users. Would encourage more space

Additionally, pavement parking on the road should be banned here as its leaving not enough space and forcing people onto the road when walking.
Temporary closure:
Problem
closure
116690Photo #116690One lane should be turned into a cycleway in each direction once current works are finished as the current shared use path is too narrow to walk on socially distanced.Cycleway:
Problem
cycleways
116689Photo #116689One lane should be turned into a cycleway in each direction once current works are finished as the current shared use path is too narrow to walk on socially distanced.Cycleway:
Problem
cycleways
116683Photo #116683This road should be made access only, like Fontmell Park becuase the pavements are too narrow to socially distance on while walking and it is a rat run currently.Temporary closure:
Problem
closure
116677Photo #116677This road should be made access only like Fontmell Park as it is used as a rat run and the pavements are too narrow to walk on and socially distanceTemporary closure:
Problem
closure
116672Photo #116672The parking here should be closed and space made for socially distant walking and cyclingCycleway:
Problem
cycleways
116669Photo #116669The parking here should be closed for cars and made into space for socially distant walking and cyclingTemporary closure:
Problem
closure
116666Photo #116666There is space here to have a cycle lane (removing some old unused parking bays and continuing on from the previous section)Cycleway:
Problem
cycleways
116662Photo #116662The parking here should be closed to cars to allow socially distanced walking and cycling.Temporary closure:
Problem
closure
116659Photo #116659The parking here should be closed and made into a cycleway (already has bus stop bypasses)Temporary closure:
Problem
closure
116651Photo #116651The parking in front of the shops is not needed and should be closed to cars to allow people to socially distance when walking and cycling.Temporary closure:
Problem
closure
74223Photo #74223Walk on a road? You’re a jaywalker and deserve to die. t.co/eco5Aqf9uJ t.co/n35TLT7rChRoad environment:
Event
road
61108Photo #61108Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.Cycleway:
Infrastructure
cycleways
61107Photo #61107Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.Cycleway:
Infrastructure
cycleways
61106Photo #61106Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.Cycleway:
Infrastructure
cycleways
61105Photo #61105Junction on the Thames-side NCN route 4 at the new Walton BridgeCycleway:
Infrastructure
cycleways
61104Photo #61104Cyclists Rejoin Carriageway - but in fact most will want to to cross the road to the riverside trail.General sign/notice:
Problem
signs
61103Photo #61103Shared-use path by the road up to the new Walton Bridge and new bridleway signed for horses only to the right.Cycleway:
Infrastructure
cycleways
61102Photo #61102Cycle parking at new Walton Bridge café/toilets/information centreCycle parking:
Infrastructure
cycleparking
61101Photo #61101Bridleway link below the new Walton bridge - temporarily closed due to some minor dampness at the bottom.Obstruction:
Problem
obstructions
61100Photo #61100It's absurd that this new bridleway in Walton on Thames is signed only as a horse-riding route.General sign/notice:
Problem
signs
56325Photo #56325Fast road with no cycle lanes or safe crossingRoad environment:
Problem
road

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://ashfordsurrey.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.