The most recent photos are listed first. See also photomap view.
This listing only shows photos within Ashford (Surrey).
Go to the national CycleStreets photo listings for photos beyond.
Shared-use path by the road up to the new Walton Bridge and new bridleway signed for horses only to the right.
End of shared-use footway from the new Walton bridge (there are dropped kerbs and an island to the right, but no formal crossing)
Link to Thames-side path from the new Walton bridge - and annoying Cyclists Dismount sign because of course cyclists can't be trusted to turn 90 degrees without mowing pedestrians down
Plastic geotextile surface on Thames Path (cycle route) - very rough, though it'd be much better if laid level.
Walton Bridge - cyclists can use the old bridge across the Thames, but have to use the busy carriageway across the dry bridge immediately southeast. To be changed, perhaps, when the new bridge is built.
Walton Bridge Road - a major bottleneck. Cyclists can use the old bridge to the east. A major new bridge is planned, presumably with some kind of cycle facilities.