Photo listing: (infrastructure)
The most recent photos are listed first. See also photomap view.
Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.
Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.
Bizarre set-up below the new Walton Bridge with separate bridleway and shared-use cycleway.
Junction on the Thames-side NCN route 4 at the new Walton Bridge
Shared-use path by the road up to the new Walton Bridge and new bridleway signed for horses only to the right.
Cycle parking at new Walton Bridge café/toilets/information centre
Cycle parking at Shepperton station
Cycle parking at Shepperton station
Signage towards Shepperton station
Ferry Lane, Shepperton, closed by the January 2014 Thames floods
Concrete block parking at Shepperton old church
Short cycle lane leading in to roundabout - and road closed by flooding
Cycle lanes on roundabout only
End of shared-use footway from the new Walton bridge (there are dropped kerbs and an island to the right, but no formal crossing)
Temporary cycle/pedestrian access to the new Walton bridge past new roundabout
Shared-use footway on the new Walton bridge
Link to Thames-side path from the new Walton bridge - and annoying Cyclists Dismount sign because of course cyclists can't be trusted to turn 90 degrees without mowing pedestrians down
The new Walton bridge - and the January 2014 Thames flood
Link under the new Walton bridge to the Thames-side path
Shared-use footway to the new Walton bridge
The new Walton Bridge - the Bailey Bridge alongside (for cyclists) has been demolished, and the new footways will be open for cycling, but not yet.
No cycling on the Thames Path under the A308, Staines
Thames Path, Staines - no cycling here
Funky modern design in Staines town centre - no signs to ban cycling, but it's probably not allowed here.
Plastic geotextile surface on Thames Path (cycle route) - very rough, though it'd be much better if laid level.
Walton Bridge - cyclists can use the old bridge across the Thames, but have to use the busy carriageway across the dry bridge immediately southeast. To be changed, perhaps, when the new bridge is built.
Walton Bridge Road - a major bottleneck. Cyclists can use the old bridge to the east. A major new bridge is planned, presumably with some kind of cycle facilities.
The Thames Path crosses the river by ferry from Shepperton to Weybridge
Thames Path cycle route at start of Shepperton bypass.
Thames Path cycling route following the Chertsey Road on shared-use path for quite a way.
Start of Thames Path south/east from Staines
Staines - cycle route from the train station to the bus station (under the bridge)
Station Path, Staines - from the station to the town centre
* Items marked with an asterisk [*] are required fields and must be fully completed.